Madewell logo
  • Manholes/Lift Stations
  • Wastewater Treatment
  • Industrial Applications
  • Equipment
  • Specifications/MSDS
  • Product Overviews
         - Mainstay ML-72
         - Mainstay ML-CA
         - Mainstay ML-10
         - Mainstay DS-4
         - Mainstay DS-5
         - Mainstay DS-6
         - Madewell 806

    Mainstay logo

  • Manholes/Lift Stations

    Before

    A brick manhole with leaks and infiltration, prior to restoration.

    Before image of a manhole


    After

    The same manhole two hours later lined with 3/4" of Mainstay ML-72 and 0.100" (100 mils) of Mainstay DS-5. All leaks and infiltration have been eliminated. The interior surface is smooth and continuous throughout.


    Image of a manhole after restoration with Mainstay


    Lift Stations

    Because of the unique simultaneous application of the ML-72 restoration mortar and DS-5 Epoxy topcoat, this 12' diameter x 30' deep lift station was prepped, rehabilitated and corrosion proofed in a single day.


    Image of a lift station after restoration with Mainstay